Army Reserve Center
Omaha, NE

Project Scedule
The project started in November of 2007 and was completed on schedule November 9, 2009
Major Program Spaces
§ Training Building: 80,121 square feet
§ Maintenance Building: 20,625 square feet
§ Unheated Storage Building: 4,556 square feet
§ Pump House: 1,444 square feet
Project Description
After many years of use, the Army decided to build a new state of the art Training and Maintenance facility to replace the pre-World War II building in north Omaha. The facility consisting of a Training Building, and Operational Maintenance Building required the coordination of several trades to complete the project. To complete the project on time an aggressive schedule was developed to allow all trades to complete their work. Creative and innovative methods of prefabrication were adopted. Nearly fifty percent of the project was prefabricated so that when our allotted installation time came up on the schedule we were able to reduce the time allotted which helped the project to move along at a faster pace. Auto cad coordination drawings were critical for the success of this project. All sub contractors participated in this process so that at the time of construction everyone knew what location their work would be installed. The contract required a vehicle wash recycle system. This closed loop system was designed through the value engineering process and the use of cad drawings provided by Midlands Mechanical. An HVAC commissioning team was developed for the final phase of the project to verify the successful completion of the HVAC system.
The facility is described as an 800 soldier facility serving 14 units. An average drill weekend will support over 250 soldiers.
There are four buildings totaling 106,746 square feet
Training Building: 80,121 square feet
Maintenance Building: 20,625 square feet
Unheated Storage Building: 4,556 square feet
Pump House: 1,444 square feet
The work performed by Midlands Mechanical, Inc. included:
Coordination drawings includes:
Produce cad drawings and spool sheets for shop fabrication.
Provide cad drawings for coordination with other contractors such as electrical,
ductwork, and fire protection.
The plumbing system includes:
Waste and vent piping, and condensate drain piping for equipment.
Domestic water piping with pipe insulation.
Plumbing fixtures and hot water heaters with storage tanks.
Kitchen equipment.
Special plumbing systems include:
Radon Mitigation piping.
Oil product overhead dispensing system.
Hydrokleen vehicle wash water recycling system.
The pump house consists of the following equipment:
One thousand gallon expansion tank.
Pre water filter.
Water softener.
Ultraviolet light filter.
The heating and air conditioning system includes:
Installation of boilers/chiller with associated pumps, and piping.
Installation of six air handling units with humidifiers, and associated piping.
Installation of infloor radiant heat system, unit heaters, and associated piping.
Temperature controls.
Pipe and ductwork insulation.
Commissioning of the heating and air conditioning system.
The natural gas service includes:
Connection of gas piping to new gas meter.
Connection of gas piping to Hotsy wash system, boilers, water heaters, gas unit heaters,
radiant heaters and makeup air units.
The seismic/force protection system includes:
Secure all air separators and expansion tanks.