Lincoln, NE

Project Statistics
Scheduled Completion Date: August 31, 2006
Actual Completion Date: August 10, 2006
Construction Method: Bid and Spec
Architect:
Nielsen – Mayne Architecture
Mechanical Engineer:
Farris Engineering
Major Program Spaces
§ Mechanical and Plumbing Installation For New 45,300 Square Foot Facility
Project Description
The Nebraska Machinery Company is a Nebraska based business that was founded in 1938 in North Platte. The original intention of the business was the sale of heavy equipment. In a series of expansions beginning in 1983 the company has grown into four divisions: The original heavy equipment division, engine repair division, a lift truck division and a rental services division catering to the needs of construction contractors statewide.
The Nebraska Machinery project was a perfect example of the critical importance of scheduling and coordination in the construction industry. To complete the construction of the 45,300 square foot facility in 135 business days an aggressive schedule was developed. During the project over 15,720 feet of sanitary, domestic, hydronic and process piping and associated equipment was installed by our workforce. Midland’s crews worked simultaneously onsite and in our fabrication shop to prefabricate every possible piping and hanger assembly in order to meet the construction deadline. The 7,440 man-hours of work accomplished within the strict deadline of this project was performed with zero OSHA recordable accidents. Midlands Mechanical, Inc. is proud of the efforts of our team members and their ability to deliver a high quality product on schedule, as promised.
System Components
§ 1 - B&G Packaged Radiant Heating System with TekMar Controllers
§ 12 - Rittling Cabinet Unit Heaters and Unit Heaters
§ 4 – B&G Series 60 Inline Pumps
§ 1 – Culligan Hi-Flow 2E Commercial Water Softener
§ 2 – AO Smith BTI 100 Natural Gas Fired Water Heaters
§ 1 – PS International 1200 Gallon Oil Water Separator Sump Tank
§ 1 – PS International 900 PSI Gallon Oil Water Separator
§ 2 – Eshland B500 Waste Oil Boilers
§ 1 – 8225 Gallon Waste Oil Storage Tank
§ 1 – Simplex SPS-10 Waste Oil Pump Skid
§ 1 – Aerco KC-1000GWB Natural Gas Fired Condensing Boiler
§ 29,400 Linear Feet of Onix Radiant Tubing
Project Responsibilities
§ Hot Water Heat Piping
§ Radiant Heating Piping
§ Chilled Water Piping
§ Fuel Oil Piping
§ Domestic Water Piping
§ Roof Drain Piping
§ Waste and Vent Piping
§ Compressed Air Piping
§ Temperature Controls
§ Underground Utilities
§ HVAC Equipment Setting