Project Description:
The project consists of two stories of classrooms, a common area, kitchen and gymnasium. Air handling units and mechanical room were located in a crawlspace. Climate control was accomplished with seven (7) air handling units, a four pipe heating / chilled water loop, three (3) high efficiency 3,000 MBH boilers, a 200 ton chiller, a 32,500 CFM cooling tower, Ice Storage Tanks, VAV terminals, split systems, cabinet and unit heaters. Midlands Mechanical, Inc. performed all of the mechanical and plumbing work.
Project Team and Statistics
- Architect: Christiansen, Reece and Partners, PC AIA
- Mechanical Engineer: Envision Mechanical Engineers, Inc.
- General Contractor: JHL Constructors, Inc.
- Completion Date: July 2009
- Bid Type: Hard bid, Plan and spec
Major Program Spaces
- New construction
- 2 story middle school
- 32,414 square feet
Project Responsibilities
- Hot water heat Piping
- Chilled Water Piping
- Domestic Water Piping
- Waste and Vent
- Acid Waste and Vent
- Roof Drains
- Natural Gas
- Sheetmetal / Air Distribution
- Insulation
- Chemical Treatment
- Temperature Controls