Cimarron Middle School

Submitted by UNANIMOUS on

Project Description:

The project consists of two stories of classrooms, a common area, kitchen and gymnasium. Air handling units and mechanical room were located in a crawlspace. Climate control was accomplished with seven (7) air handling units, a four pipe heating / chilled water loop, three (3) high efficiency 3,000 MBH boilers, a 200 ton chiller, a 32,500 CFM cooling tower, Ice Storage Tanks, VAV terminals, split systems, cabinet and unit heaters. Midlands Mechanical, Inc. performed all of the mechanical and plumbing work.

Project Team and Statistics

  • Architect: Christiansen, Reece and Partners, PC AIA
  • Mechanical Engineer: Envision Mechanical Engineers, Inc.
  • General Contractor: JHL Constructors, Inc.
  • Completion Date: July 2009
  • Bid Type: Hard bid, Plan and spec

Major Program Spaces

  • New construction
  • 2 story middle school
  • 32,414 square feet

 Project Responsibilities

  • Hot water heat Piping
  • Chilled Water Piping
  • Domestic Water Piping
  • Waste and Vent
  • Acid Waste and Vent
  • Roof Drains
  • Natural Gas
  • Sheetmetal / Air Distribution
  • Insulation
  • Chemical Treatment
  • Temperature Controls
 