Fremont 5&6 Center School

Submitted by UNANIMOUS on

Project Description:

MMI performed the mechanical portion on this plan / spec project which was a new facility.

Project Team and Statistics

  • Architect: Jackson-Jackson & Associates
  • Mechanical Engineer: Farris Engineering
  • General Contractor: Hampton Construction
  • Completion Date: January 2012
  • Bid Type: Plan and spec

Major Program Spaces

  • New construction – 12,300 square feet
  • Existing renovation – 12,220 square feet

 Project Responsibilities

  • Hot water heat Piping
  • Chilled Water Piping
  • Domestic Water Piping
  • Waste and Vent
  • Compressed Air
  • Medical Gas and Certification
  • Sheetmetal / Air Distribution
  • Temperature Controls
  • Balancing
  • Mechanical Equipment Setting
  • Insulation
 