Good Samaritan Hospital

Submitted by UNANIMOUS on

Project Description:

The project consisted of a new expansion to the existing Good Samaritan. All services were required including medical gas services, plumbing, and hot water heat and air distribution. This includes demolition and installation of new system from the existing Central Utilities Plant on site (without interrupting the hospitals current services). Midlands Mechanical, Inc. modeled all of our components and ran the coordination for the job, coordinating with all trades in order to ensure that all systems had space. Once coordination was approved by areas, we used our model for spooling, reporting, and more so the field was efficiently able to construct what they needed to on time. This included hanger locations and spacing, pipe racks, and equipment locations / connections. Over 98,000 feet of pipe was installed and roughly 400 medical gas service connections were made.

Project Team and Statistics

  • Architect: AE Com
  • Mechanical Engineer: AE Com
  • General Contractor: AE Com
  • Completion Date: November 2013
  • Bid Type: Hard Bid, plan and spec

Major Program Spaces

  • New expansion to existing building 164,000 square feet
  • Two large mechanical rooms – 9,000 square feet

Project Responsibilities

  • 3D Model and Coordination
  • Medical Gas Piping and Certification
  • Hot water heat Piping
  • Chilled Water Piping
  • Domestic Water Piping
  • Roof Drain Piping
  • Chemical Treatment
  • Insulation
  • Waste and Vent Piping
  • Steam and Condensate Piping
  • Sheetmetal / Air Distribution
  • Temperature Controls
  • Underground Utilities
  • All Mechanical Equipment Setting
 
green building councilassociated builders and creatorsOSHA