Project Description:
Little Raven Elementary School is the third new elementary school we have constructed for Littleton Public Schools over a 3-1/2 year span. This school is a 76,000 Square foot elementary located in Littleton Colorado. The school has 2 boilers, 6 Rooftop Units and over 85 hydronic VAV reheat coils. There are also over 120 plumbing fixtures in the school which also includes a commercial kitchen and dedicated 140 degree hot water system and water heater. There is a domestic water booster pump which feeds a 4” diameter domestic cold water main and 3” domestic hot water main running throughout the school as well as a 1-1/2” hot water recirculation line. Construction began in April of 2022 and completed in July of 2023.


