Project Description:
Job consisted of addition of new patient wing built separate from the existing hospital. This wing consisted of 27 individual patient rooms and a new LDR area. A 600’ temporary corridor was constructed to allow access to the wing after occupation. Existing patient wing was then demolished and a new surgery wing was constructed that connected the existing hospital to the new surgery wing, after which the temporary corridor was removed. The surgery wing consisted of 3 new OR’s with a 4th area for future, new endoscopy area and a new observation area.
During these phases the boiler room was completely re-done with 3 new steam boilers, new feed water tanks and chemical treatment system. Two temporary boilers were utilized to maintain steam to the hospital during this process. Also the existing south penthouse was renovated completely. This included 3 new air handling units and a completely new heating water system. This process involved placing one new AHU and connecting existing units to it temporarily so they could be removed and new units placed.
Project Team and Statistics:
- Architect: HDR
- Mechanical Engineer: HDR
- General Contractor: JE Dunn
- Completion Date: June 2012
- Bid Type: Plan and spec
Major Program Spaces:
- New expansion to existing building – 53,000 square feet
- Remodeled area – 4,100 square feet
Project Responsibilities:
- 3D Model and coordination
- Medical Gas Piping and Certification
- Hot water heat Piping
- Chilled Water Piping
- Domestic Water Piping
- Roof Drain Piping
- Chemical Treatment
- Insulation
- Waste and Vent Piping
- Steam and Condensate Piping
- Sheetmetal / Air Distribution
- Underground Utilities
- Mechanical Equipment Setting