Project Description:

The project consists of two stories of classrooms, a common area, kitchen and gymnasium. Air handling units and mechanical room were located in a ‘drive-in’ crawlspace. Climate control was accomplished with twelve (12) air handling units, five (5) high efficiency 50 HP boilers, a 315 ton chiller, a 50,000 CFM cooling tower, VAV terminals, split systems, cabinet and unit heaters, a four pipe heating / chilled water loop. Midlands Mechanical, Inc. performed all of the mechanical and plumbing work.

Project Team and Statistics

  • Architect: Christiansen, Reece and Partners, PC AIA
  • Mechanical Engineer: Smith Seckman Reid, Inc
  • General Contractor: W.O. Danielson Construction Company, Ltd.
  • Completion Date: June 2008
  • Bid Type: Hard bid, Plan and spec

Major Program Spaces

  • New construction
  • 2 story middle school
  • 132,414 square feet

Project Responsibilities

  • Hot water heat Piping
  • Chilled Water Piping
  • Domestic Water Piping
  • Waste and Vent
  • Acid Waste and Vent
  • Roof Drains
  • Natural Gas
  • Sheetmetal / Air Distribution
  • Insulation
  • Chemical Treatment
  • Temperature Controls
 