Project Description:
The project consists of two stories of classrooms, a common area, kitchen and gymnasium. Air handling units and mechanical room were located in a ‘drive-in’ crawlspace. Climate control was accomplished with twelve (12) air handling units, five (5) high efficiency 50 HP boilers, a 315 ton chiller, a 50,000 CFM cooling tower, VAV terminals, split systems, cabinet and unit heaters, a four pipe heating / chilled water loop. Midlands Mechanical, Inc. performed all of the mechanical and plumbing work.
Project Team and Statistics
- Architect: Christiansen, Reece and Partners, PC AIA
- Mechanical Engineer: Smith Seckman Reid, Inc
- General Contractor: W.O. Danielson Construction Company, Ltd.
- Completion Date: June 2008
- Bid Type: Hard bid, Plan and spec
Major Program Spaces
- New construction
- 2 story middle school
- 132,414 square feet
Project Responsibilities
- Hot water heat Piping
- Chilled Water Piping
- Domestic Water Piping
- Waste and Vent
- Acid Waste and Vent
- Roof Drains
- Natural Gas
- Sheetmetal / Air Distribution
- Insulation
- Chemical Treatment
- Temperature Controls