Project Description:
Midlands Mechanical completed full mechanical and plumbing piping installation for the new 45,300 square foot Nebraska Machinery facility in Lincoln, Nebraska. This project was completed in 135 business days under an aggressive schedule and required full coordination across trades and fabrication teams. The job included 15,720 feet of sanitary, domestic, hydronic, and process piping, all prefabricated and installed by our crew.
- (1) B&G Packaged Radiant Heating System with TekMar Controllers
- (12) Rittling Cabinet Unit Heaters and Unit Heaters
- (4) B&G Series 60 Inline Pumps
- (1) Culligan Hi-Flow 2E Commercial Water Softener
- (2) AO Smith BTI 100 Natural Gas Fired Water Heaters
- (2) Eshland B500 Waste Oil Boilers
- (1) PS International 1200 Gallon Oil Water Separator Sump Tank
- (1) PS International 900 PSI Waste Oil Water Separator
- (1) Simplex SPS-10 Waste Oil Pump Skid
- (1) Aerco KC-1000GWB Natural Gas Fired Condensing Boiler
- 29,400 Linear Feet of Onix Radiant Tubing
Scope of Work & Responsibilities:
Our work at Nebraska Machinery included:
- Hot water heat piping
- Chilled water piping
- Radiant heating piping
- Fuel oil piping
- Domestic water piping
- Roof drain piping
Client Note:
This was a fast-track project with strict timelines and no room for rework. Our team delivered a clean install with full prefabrication, tight sequencing, and zero safety issues — on time and on budget.