Regis University - Clarke Hall

Submitted by UNANIMOUS on

Project Description:

This four story administrative building had multiple systems. Midlands Mechanical, Inc. did 3D coordination which greatly aided in the construction of this job. As with our other coordination jobs, the coordination model (in Navisworks) was used on site by our field guys to visualize what would be getting installed. We also installed Low Pressure Campus Steam and Condensate along with Chilled Water Supply and Return that was routed from the Campus Plant to new building. This was approximately 400’ from building to building, and 1,600’ of underground steel pipe with HDPE Jacket. The mechanical room housed large Plate and Frame and Shell and Tube Heat Exchangers, Solar Panel and Solar Energy Domestic Water Storage System. On the roof were (2) Alliance Air Products custom Air Handling Rooftop Units that were over 35’ long, 10’ wide, and over 10’ tall. We did design / assist with the snow melt and radiant heat loop layout along with a steam condensate vault and receiver.

Project Team and Statistics

  • Architect: Soderstrom Architects
  • Mechanical Engineer: Interface Engineering
  • General Contractor: Golden Triangle Construction
  • Completion Date: December 2012
  • Bid Type: Plan and spec with some design assist

Major Program Spaces

  • New construction
  • 4 story Administrative Building 
  • 100,000 square feet

Project Responsibilities

  • 3D Model and coordination
  • Hot water heat Piping
  • Chilled Water Piping
  • Domestic Water Piping
  • Roof Drain Piping
  • Insulation
  • Waste and Vent Piping
  • Sheetmetal / Air Distribution
  • Underground Utilities
  • Steam / Condensate
  • Snow Melt System
  • Radiant Heating
  • Mechanical Equipment Setting
 