Sysco Foods

Submitted by UNANIMOUS on

Project Description:

Midlands Mechanical, Inc. was hired for this design / build which involved remodeling an existing plant as well as new construction in order to suit the owner’s needs. We furnished and installed the complete plumbing, HVAC in the office mezzanine area, battery charging area, Kitchen conference area, Vehicle Maintenance Facility, and Beverage shop. We also furnished and installed radiant heat in the dry dock area, provided complete plumbing in the refrigeration mechanical room. 

Project Team and Statistics

  • Architect: Nexus
  • Mechanical Engineer: AES Engineering
  • General Contractor: Big D Construction
  • Completion Date: August 2012
  • Bid Type: Design Build

Major Program Spaces

  • Remodel existing building – 197,723 square feet
  • Additional new construction – 176,535 square feet

 Project Responsibilities

  • Domestic Water Piping
  • Roof Drain Piping
  • Insulation
  • Waste and Vent Piping
  • Natural Gas
  • Sheetmetal / Air Distribution
     
 